የመውጣት ቅጽ CB240

የመውጣት ፎርም CB240 ከፍ ያለ ግድግዳዎችን ለማፍሰስ በሰፊው ጥቅም ላይ የሚውል የክሬን ጥገኛ የመውጣት ስርዓት እና የድጋፍ መዋቅር ነው። እንደ ጭነት-ተሸካሚ መድረክ እና እንዲሁም ደህንነቱ የተጠበቀ የስራ መድረክን ያከናውናል.

በመድረኩ ርዝመት ላይ በመመስረት የመውጣት ስርዓት ከመሬት በላይ ከ 100 ሜትር በላይ ከፍታ ላይ የሚውል ሲሆን እስከ 5.40 ሜትር የሚደርስ ከፍተኛ የቅርጽ ስራ ቁመት ይፈቅዳል.



የምርት ዝርዝር

መግለጫዎች

Platform width:      2.4m
Roll-back system:   70 cm with carriage and rack system
Finishing platform:  for removing the climbing cone, polishing concrete surface etc.
Anchor system:      should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork:            can be moved horizontally, vertically and tilted to meet site requirement.
Main platform:       provide workers a safe working platform
Finishing platform:  there is an access to the main platform by using a safety ladder.

  • Read More About china semi automatic climbing formwork

     

  • Read More About climbing formwork for core wall

     

  • Read More About china climbing formwork system

     

  • Read More About china climbing system formwork

     

ጥቅሞች

  • ከሁሉም የኮንስትራክሽን ግድግዳ ቅርጾች ጋር ​​ተኳሃኝ.
  • በቅንፍ እና የቅርጽ ስራ ፓነሎች የተገነቡት ስብስቦች በአንድ ነጠላ ክሬን ማንሳት ወደ ቀጣዩ የማፍሰሻ ደረጃ ይንቀሳቀሳሉ።
  • ቀጥ ያሉ ፣ የታዘዙ እና ክብ ግድግዳዎችን ጨምሮ ለማንኛውም መዋቅሮች ተስማሚ።
  • የሥራ መድረኮችን በተለያዩ ደረጃዎች መገንባት ይቻላል በደህንነት ደረጃዎች የሚሰጠውን መድረክ መድረስ.
  • ሁሉም ቅንፎች የእጅ ወለሎችን ፣ ፑልፕሮፕስ እና ሌሎች መለዋወጫዎችን ለመጠገን ሁሉንም ማገናኛዎች ያካትታሉ።
  • የመወጣጫ ቅንፎች በሠረገላ እና በመደርደሪያ የተገነባውን በእነዚህ ቅንፎች ውስጥ የተካተቱትን የስርዓተ-ቅርጽ ስራዎችን ወደ ኋላ መመለስን ያስችላቸዋል።
  • Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
  • ቅንፎች ከመልህቅ ሾጣጣ ስርዓት ጋር በግድግዳው ላይ ተጣብቀዋል።

የመውጣት ሂደት

Read More About climbing formworkደረጃ 1

The first pouring is to be completed by using the proper wall elements and has to be exactly

struts በማስተካከል ጋር የተስተካከለ.

Read More About climbing formworks

ደረጃ 2

The completely pre-assembled climbing scaffold units consisting of

climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured.

Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed.

Read More About climbing formwork system

ደረጃ 3

After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system.

Read More About climbing system formwork

ደረጃ 4

Release and remove bolts that fixing the positioning anchor point.

ማሰሪያ-ዘንግን ይፍቱ እና ያስወግዱ

Loosen the wedges of the carriage unit.

Read More About self climbing formwork system

ደረጃ 5

Retract the carriage and lock it with wedge.

የላይኛው መወጣጫ ሾጣጣዎችን ይጫኑ

የንፋስ መከላከያ መሳሪያ ካለ ይፍቱ

የታችኛው መወጣጫ ሾጣጣውን ያስወግዱ

 

Read More About automatic climbing formwork system

ደረጃ 6

Adjust the carriage into the common center of gravity and lock it again.

የክሬኑን ወንጭፍ ወደ ቁመታዊው ዋሊንግ ያያይዙት።

የቅንፉ የደህንነት ብሎኖች ያስወግዱ

Lift the climbing bracket by crane and attach it to the next prepared climbing cone.

የደህንነት ቦኖቹን ያስገቡ እና እንደገና ይቆልፉ።

አስፈላጊ ከሆነ የንፋስ ጭነት መሳሪያውን ይጫኑ.

Read More About auto climbing formwork system

ደረጃ 7

Move the carriage back and lock it by wedge.

የቅርጽ ስራውን ያጽዱ.

የማጠናከሪያ አሞሌዎችን ይጫኑ.

Read More About climbing formworks

ደረጃ 8

Move the formwork forward until lower  end rests against top of the finished section of the wall

የግፋ-ጎትት ማሰሪያን በመጠቀም የቅርጽ ስራን በአቀባዊ ያስተካክሉ።

ለግድግድ ቅርጽ ስራ የማሰር-ዘንጎችን ያስተካክሉ

 

 