Encofrat enfilant CB240
Descripcions
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Avantatges
- Compatible amb tots els encofrats de murs de Construccion.
- Els conjunts formats per suports i panells d'encofrat es traslladen al següent pas d'abocament amb un sol elevador de grua.
- Adaptable a qualsevol estructura, incloses parets rectes, inclinades i circulars.
- És possible construir plataformes de treball a diferents nivells. L'accés a les plataformes és proporcionat per escales de seguretat.
- Tots els suports inclouen tots els connectors per fixar passamans, puntals push-pull i altres accessoris.
- Els suports d'escalada permeten enrotllar els panells d'encofrat mitjançant un sistema, format per un carro i una cremallera, incorporat en aquests suports.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Els suports estan ancorats a la paret amb un sistema de con d'ancoratge.
Procediment d'escalada
The first pouring is to be completed by using the proper wall elements and has to be exactly alineat amb puntals d'ajust. |
Pas 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Pas 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Pas 4 Release and remove bolts that fixing the positioning anchor point. Afluixeu i traieu el tirant Loosen the wedges of the carriage unit. |
Pas 5 Retract the carriage and lock it with wedge. Instal·leu cons d'escalada superiors Afluixeu el dispositiu de protecció del vent, si n'hi ha Traieu el con d'escalada inferior
|
Pas 6 Adjust the carriage into the common center of gravity and lock it again. Enganxeu l'eslinga de la grua a la planxa vertical Traieu els cargols de seguretat del suport Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Torneu a inserir i bloquejar els cargols de seguretat. Instal·leu el dispositiu de càrrega del vent, si cal. |
Pas 7 Move the carriage back and lock it by wedge. Netegeu l'encofrat. Instal·leu barres de reforç. |
Pas 8 Move the formwork forward until lower end rests against top of the finished section of the wall Ajustar l'encofrat verticalment mitjançant tirants push-pull. Fixar tirants per a l'encofrat de paret |