Encofrado trepador CB240
Descricións
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Vantaxes
- Compatible con todos os encofrados de muros de Construccion.
- Os conxuntos formados por soportes e paneis de encofrado móvense ao seguinte paso de vertedura cun único elevador de guindastre.
- Adaptable a calquera estrutura, incluíndo muros rectos, inclinados e circulares.
- É posible construír plataformas de traballo a diferentes niveis. O acceso á plataforma está provisto de escaleiras de seguridade.
- Todos os soportes inclúen todos os conectores para fixar pasamáns, punteiros push-pull e outros accesorios.
- As ménsulas trepadoras permiten enrolar os paneis de encofrado mediante un sistema, formado por carro e cremallera, incorporado a estas ménsulas.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Os soportes están ancorados á parede cun sistema de conos de ancoraxe.
Procedemento de escalada
The first pouring is to be completed by using the proper wall elements and has to be exactly aliñados con puntais de axuste. |
Paso 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Paso 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Paso 4 Release and remove bolts that fixing the positioning anchor point. Afrouxa e retire o tirante Loosen the wedges of the carriage unit. |
Paso 5 Retract the carriage and lock it with wedge. Instalar conos de escalada superiores Afrouxa o dispositivo de suxeición do vento, se é o caso Retire o cono de escalada inferior
|
Paso 6 Adjust the carriage into the common center of gravity and lock it again. Coloque a eslinga do guindastre ao muro vertical Retire os parafusos de seguridade do soporte Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Insira e bloquee de novo os parafusos de seguridade. Instale o dispositivo de carga de vento, se é necesario. |
Paso 7 Move the carriage back and lock it by wedge. Limpar o encofrado. Instalar barras de reforzo. |
Paso 8 Move the formwork forward until lower end rests against top of the finished section of the wall Axuste o encofrado verticalmente mediante tirantes push-pull. Fixar tirantes para o encofrado de muros |