Fôrma trepante CB240
Descrições
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Vantagens
- Compatível com todas as cofragens de parede Construccion.
- Os conjuntos compostos por consoles e painéis de cofragem são movidos para a próxima etapa de concretagem com um único guindaste.
- Adaptável a qualquer estrutura, incluindo paredes retas, inclinadas e circulares.
- É possível construir plataformas de trabalho em diferentes níveis. O acesso às plataformas é feito por escadas de segurança.
- Todos os suportes incluem todos os conectores para fixação de corrimãos, suportes push-pull e outros acessórios.
- Os consoles trepantes permitem o retrocesso dos painéis de cofragem através de um sistema, formado por um carro e uma cremalheira, incorporados nestes consoles.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Os suportes são ancorados na parede com sistema de cone de ancoragem.
Procedimento de escalada
The first pouring is to be completed by using the proper wall elements and has to be exactly alinhado com os suportes de ajuste. |
Passo 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
etapa 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Passo 4 Release and remove bolts that fixing the positioning anchor point. Afrouxe e remova o tirante Loosen the wedges of the carriage unit. |
Etapa 5 Retract the carriage and lock it with wedge. Instale cones de escalada superiores Afrouxe o dispositivo de proteção contra vento, se houver Remova o cone de escalada inferior
|
Etapa 6 Adjust the carriage into the common center of gravity and lock it again. Prenda a eslinga do guindaste na parede vertical Remova os parafusos de segurança do suporte Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Insira e trave os parafusos de segurança novamente. Instale o dispositivo de carga de vento, se necessário. |
Etapa 7 Move the carriage back and lock it by wedge. Limpe a cofragem. Instale barras de reforço. |
Etapa 8 Move the formwork forward until lower end rests against top of the finished section of the wall Ajustar a cofragem verticalmente através do suporte push-pull. Fixar tirantes para cofragem de parede |