On tight city jobs and boundary walls, you don’t always have room for through-ties. That’s where HORIZON’s Single-side bracket system comes in—base frame, lower frame, upper frame, and standard frame stacking cleanly up to 8.9 m. In fact, crews like how it behaves under fresh-concrete pressure without needing a second face. To be honest, that’s a relief on many basement pours.
| Item | Single side wall formwork (HORIZON) |
|---|---|
| Height extension | Up to 8.9 m (stacked frames) |
| Allowable lateral pressure | ≈ 60 kN/m² (site-dependent; pour rate and temperature matter) |
| Frame material | Q345B steel, welds to GB/T standards; bolts grade 10.9 |
| Facing options | 18 mm film-faced plywood or HPL; ≈ 50–80 reuses |
| Finish | Powder coat or hot-dip galvanized |
| Anchoring | Base anchors (e.g., M24 chemical/mechanical), waler ties, alignment struts |
| Safety factor | Typically 1.5–2.0 to EN/ACI practices |
| Service life | Around 5–10 years for frames with proper maintenance |
Applications: boundary and basement walls, sewage plants, culverts, elevator pits, retaining walls, tank internals—anywhere through-ties are impractical. Many customers say setup time drops about 20–30% once crews know the routine.
Materials are cut and robot-welded, then frames are coated. Pre-assembly checks cover squareness, hole tolerance, and latch fit. Load tests follow EN 12812 with 1.2× design load hold; concrete pressure assumptions align with DIN 18218 and ACI 347R. Typical factory records: bracket deflection ≤ L/400 under rated pressure; anchor pull-out tests on M24 anchors > 120 kN (substrate-dependent). Certifications commonly include ISO 9001:2015; CE-marked accessories on request.
| Vendor | Origin | Max height | Typical load | Certifications | Lead time | Customization | After-sales |
|---|---|---|---|---|---|---|---|
| HORIZON | Xingtai, Hebei, China | 8.9 m | ≈ 60 kN/m² | ISO 9001; CE-ready parts | 15–25 days | High (anchors, finish, facing) | Remote training, layout drawings |
| Vendor A | EU | 8.0 m | ≈ 55 kN/m² | CE, ISO 9001 | 4–6 weeks | Medium | On-site (EU) |
| Vendor B | Local fabricator | ≈ 6–7 m | ≈ 40–50 kN/m² | Varies | 2–4 weeks | Low–Medium | Limited |
Options: galvanized frames for coastal air, adjustable walers for curved walls, HPL facing for slick finishes, and anchor packages tailored to your slab. Two recent cases: (1) Shenzhen basement wall—crew reported 25% faster cycle vs. previous system; (2) Water-treatment tank in the Gulf—galvanized sets showed negligible corrosion after one season. Feedback seems consistent: alignment stays true, and pour rates up to 2 m/h felt comfortable with proper venting.
If you’re evaluating China Single Sided Wall Formwork, check that your substrate can take anchor loads, confirm pour rate and temperature for pressure calcs, and ask for a layout drawing. It sounds basic, but that’s what separates a smooth pour from a nervous one.