Cassero rampante CB240
Descrizzioni
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Vantaghji
- Compatible avec tous les coffrages muraux Construccion.
- I set custituiti da parentesi è pannelli di cassero sò spustati à u prossimu passu di versazione cù una sola gru.
- Adattabile à qualsiasi struttura, cumprese pareti dritte, inclinate è circolari.
- Hè pussibule di custruisce piattaforme di travagliu à diversi livelli. L'accessu à e plataforme hè furnitu da scale di sicurezza.
- Tutti i supporti includenu tutti i connettori per riparà i corrimani, push-pullprops è altri accessori.
- I supporti di arrampicata permettenu di rinvià i pannelli di cassaforma cù un sistema, furmatu da un carru è una cremagliera, incorporati in questi supporti.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- I supporti sò ancorati à u muru cù un sistema di cuni di ancora.
Prucedura di scalata
The first pouring is to be completed by using the proper wall elements and has to be exactly allineatu cù struts di regulazione. |
Passu 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Passu 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Passu 4 Release and remove bolts that fixing the positioning anchor point. Allentate è sguassate u tirante Loosen the wedges of the carriage unit. |
Passu 5 Retract the carriage and lock it with wedge. Installa cuni di arrampicata superiore Allentate u dispusitivu di assicurazione di u ventu, s'ellu ci hè Eliminate u cune di scalata inferiore
|
Passu 6 Adjust the carriage into the common center of gravity and lock it again. Attach the crane sling to the vertical waling Eliminate i bulloni di sicurezza di u supportu Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Inserite è chjude di novu i bulloni di sicurezza. Installa u dispusitivu di carica di ventu, se necessariu. |
Passu 7 Move the carriage back and lock it by wedge. Pulite a cassatura. Installa barre di rinforzu. |
Passu 8 Move the formwork forward until lower end rests against top of the finished section of the wall Régler le coffrage à la verticale grâce à un support push-pull. Fissate i tiranti per a cassatura di u muru |