Shoring prop-Heavy duty
Khoom Taw Qhia
Steel prop yog ib qho tseem ceeb txhawb nqa ntawm HORIZON formwork system, tshwj xeeb tshaj yog nyob rau hauv lub slab formwork. Nrog rau lub prop lub peev xwm thauj khoom siab, qhov hnyav thiab ruaj khov, HORIZON slab formwork ua haujlwm zoo thiab ua haujlwm zoo ntawm qhov chaw raws li tus nqi zoo. Tsis tas li ntawd, lub prop yog ceev thiab yooj yim rau kev tuav ntawm qhov chaw.
Specification |
Peev xwm (KN) |
Qhov siab (mm) |
Nws (mm) |
Qhov hnyav (Kg) |
HZP30-300 |
30 |
1650-3000 |
75/60 |
20.9 |
HZP30-350 |
30 |
1970-3500 |
75/60 |
23.0 |
HZP30-400 |
30 |
2210-4000 |
75/60 |
25.0 |
HZP 20-300 |
20 |
1650-3000 |
60/48 |
15.7 |
HZP20-350 |
20 |
1970-3500 |
60/48 |
16.6 |
ZPO 20-450 |
20 |
2460-4500 |
60/48 |
28.2 |
HZP 20-500 |
20 |
2710-5000 |
60/48 |
30.5 |
Qhov zoo
- 1. Cov yeeb nkab steel zoo ua kom nws lub peev xwm thauj khoom siab.
2. Muaj ntau yam kev ua tiav, xws li: kub-dipped galvanization, txias galvanization, hmoov txheej thiab pleev xim.
3. Kev tsim tshwj xeeb tiv thaiv tus neeg teb xov tooj los ntawm kev ua phem rau nws txhais tes ntawm lub raj sab hauv thiab sab nrauv.
4. Lub raj sab hauv, tus pin thiab cov txiv ntoo adjustable yog tsim los tiv thaiv kev tsis sib haum xeeb.
5. Nrog tib qhov loj ntawm lub phaj thiab lub hauv paus phaj, lub taub hau prop yog yooj yim los ntxig rau hauv lub raj thiab lub raj sab nraud.
6. Cov pallets muaj zog ua kom muaj kev thauj mus los yooj yim thiab nyab xeeb. -
Important Instruction
Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.