Kofraj k ap grenpe CB240
Deskripsyon
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Avantaj
- Konpatib ak tout kofraj miray konstriksyon.
- Ansanm yo ki fòme ak parantèz ak panno kofraj yo deplase nan pwochen etap la vide ak yon sèl leve teknik.
- Adaptab a nenpòt estrikti, ki gen ladan mi dwat, enkline ak sikilè.
- Li posib pou konstwi platfòm k ap travay nan diferan nivo. Aksè nan platfòm la se nechèl sekirite yo bay.
- Tout parantèz yo gen ladan tout konektè yo ranje balistrad, push-pullprops ak lòt Pwodwi pou Telefòn.
- Parantèz yo k ap grenpe pèmèt woule-tounen panno kofraj yo lè l sèvi avèk yon sistèm, ki te fòme pa yon cha ak yon etajè, enkòpore nan parantèz sa yo.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Parantèz yo ancrage nan miray la ak sistèm kòn lank.
Eskalad pwosedi
The first pouring is to be completed by using the proper wall elements and has to be exactly ki aliyen ak ajisteman janb. |
Etap 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Etap 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Etap 4 Release and remove bolts that fixing the positioning anchor point. Dekole epi retire tirant Loosen the wedges of the carriage unit. |
Etap 5 Retract the carriage and lock it with wedge. Enstale kòn k ap grenpe anwo yo Dekole aparèy van an sekirite, si genyen Retire kòn k ap grenpe ki pi ba a
|
Etap 6 Adjust the carriage into the common center of gravity and lock it again. Tache fistibal teknik la nan Waling vètikal la Retire boulon sekirite bracket la Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Mete ak fèmen boulon sekirite yo ankò. Enstale aparèy chaj van an, si sa nesesè. |
Etap 7 Move the carriage back and lock it by wedge. Netwaye kofraj la. Enstale ba ranfòsman. |
Etap 8 Move the formwork forward until lower end rests against top of the finished section of the wall Ajiste kofraj vètikal pa mwayen atèl pouse-rale. Ranje tirant pou kofraj miray la |