Shoring prop-Heavy duty

Reglabl sipò asye pou kofraj dal
Steel prop se yon eleman sipò enpòtan nan sistèm kofraj HORIZON, espesyalman nan kofraj dal la. Avèk gwo kapasite chaj akseswar la, pwa ki ba ak estabilite, kofraj dal HORIZON travay san danje epi avèk efikasite sou sit kòm byen ke pri-efikas. Epitou, akseswar a se vit ak fasil pou manyen sou sit.

 



Pwodwi detay

Entwodiksyon pwodwi

 

Steel prop se yon eleman sipò enpòtan nan sistèm kofraj HORIZON, espesyalman nan kofraj dal la. Avèk gwo kapasite chaj akseswar la, pwa ki ba ak estabilite, kofraj dal HORIZON travay san danje epi avèk efikasite sou sit kòm byen ke pri-efikas. Epitou, akseswar a se vit ak fasil pou manyen sou sit.

Spesifikasyon

Kapasite (KN)

Wotè (mm)

Li (mm)

Pwa (Kg)

HZP30-300

30

1650-3000

75/60

20.9

HZP30-350

30

1970-3500

75/60

23.0

HZP30-400

30

2210-4000

75/60

25.0

HZP20-300

20

1650-3000

60/48

15.7

HZP20-350

20

1970-3500

60/48

16.6

HZP20-450

20

2460-4500

60/48

28.2

HZP20-500

20

2710-5000

60/48

30.5

Avantaj

 

  1. 1. Tib asye kalite siperyè asire kapasite chaj segondè li yo.
    2. Fini divès kalite ki disponib, tankou: galvanizasyon cho-tranpe, galvanizasyon frèt, kouch poud ak penti.
    3. Konsepsyon espesyal anpeche operatè a fè mal nan men l 'ant tib anndan an ak ekstèn.
    4. Tib anndan an, peny ak nwa reglabl yo fèt pwoteje kont dezagreman envolontè.
    5. Avèk menm gwosè plak la ak plak baz, tèt akseswar yo fasil pou mete nan tib enteryè a ak tib deyò.
    6. Palettes yo fò asire transpò a fasil epi san danje.
  2. Important Instruction

Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.

Si ou enterese nan pwodwi nou yo, ou ka chwazi kite enfòmasyon ou isit la, epi nou pral kontakte ou yon ti tan.


Ekri mesaj ou la a epi voye l ba nou

Kategori pwodwi yo

Si ou enterese nan pwodwi nou yo, ou ka chwazi kite enfòmasyon ou isit la, epi nou pral kontakte ou yon ti tan.


htHaitian Creole