Shoring prop-Heavy duty

Prop baja sing bisa diatur kanggo bekisting slab
Baja prop minangka komponen pendukung penting saka sistem bekisting HORIZON, utamane ing bekisting slab. Kanthi kapasitas loading prop sing dhuwur, bobote sithik lan stabilitas, bekisting slab HORIZON bisa digunakake kanthi aman lan efisien ing situs uga biaya-efektif. Uga, prop cepet lan gampang kanggo ditangani ing situs.

 



Detail Produk

Pambuka produk

 

Baja prop minangka komponen pendukung penting saka sistem bekisting HORIZON, utamane ing bekisting slab. Kanthi kapasitas loading prop sing dhuwur, bobote sithik lan stabilitas, bekisting slab HORIZON bisa digunakake kanthi aman lan efisien ing situs uga biaya-efektif. Uga, prop cepet lan gampang kanggo ditangani ing situs.

Spesifikasi

Kapasitas (KN)

Dhuwur (mm)

Dheweke (mm)

Bobot (Kg)

HZP30-300

30

1650-3000

75/60

20.9

HZP30-350

30

1970-3500

75/60

23.0

HZP30-400

30

2210-4000

75/60

25.0

HZP20-300

20

1650-3000

60/48

15.7

HZP20-350

20

1970-3500

60/48

16.6

HZP20-450

20

2460-4500

60/48

28.2

HZP20-500

20

2710-5000

60/48

30.5

Kaluwihan

 

  1. 1. tabung baja kualitas dhuwur njamin kapasitas loading dhuwur.
    2. Ana macem-macem finishing, kayata: galvanisasi panas, galvanisasi kadhemen, lapisan bubuk lan lukisan.
    3. Desain khusus ngalangi operator saka babras tangan antarane tabung njero lan njaba.
    4. Tabung njero, pin lan kacang sing bisa diatur dirancang kanggo nglindhungi saka disengagement sing ora disengaja.
    5. Kanthi ukuran piring lan piring dhasar sing padha, kepala prop gampang dilebokake ing tabung njero lan tabung njaba.
    6. Pallet sing kuwat njamin transportasi kanthi gampang lan aman.
  2. Important Instruction

Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


Tulis pesen sampeyan ing kene lan kirimake menyang kita

Kategori produk

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


jvJavanese