Shoring prop-Heavy duty
Introduzzjoni tal-Prodott
Ir-riffied tal-azzar huwa komponent importanti ta 'appoġġ tas-sistema tal-formwork HORIZON, speċjalment fil-formwork taċ-ċangatura. Bil-kapaċità ta 'tagħbija għolja tar-riffieda, piż baxx u stabbiltà, il-formwork taċ-ċangatura HORIZON jaħdem b'mod sigur u effiċjenti fuq il-post kif ukoll kost-effettiv. Ukoll, ir-riffieda hija veloċi u faċli għall-immaniġġjar fuq il-post.
Speċifikazzjoni |
Kapaċità (KN) |
Għoli (mm) |
Hu (mm) |
Piż (Kg) |
HZP30-300 |
30 |
1650-3000 |
75/60 |
20.9 |
HZP30-350 |
30 |
1970-3500 |
75/60 |
23.0 |
HZP30-400 |
30 |
2210-4000 |
75/60 |
25.0 |
HZP20-300 |
20 |
1650-3000 |
60/48 |
15.7 |
HZP20-350 |
20 |
1970-3500 |
60/48 |
16.6 |
HZP20-450 |
20 |
2460-4500 |
60/48 |
28.2 |
HZP20-500 |
20 |
2710-5000 |
60/48 |
30.5 |
Vantaġġi
- 1. Tubi ta 'l-azzar ta' kwalità għolja jiżguraw il-kapaċità għolja ta 'tagħbija tiegħu.
2. Diversi finitura huma disponibbli, bħal: galvanizzazzjoni hot-dipped, galvanizzazzjoni kiesħa, kisi tat-trab u pittura.
3. Disinn speċjali jipprevjeni lill-operatur milli jweġġa 'l-idejn tiegħu bejn it-tubu ta' ġewwa u ta 'barra.
4. It-tubu ta 'ġewwa, il-pin u l-ġewż aġġustabbli huma ddisinjati protetti kontra diżingaġġ mhux intenzjonat.
5. Bl-istess daqs tal-pjanċa u l-pjanċa tal-bażi, l-irjus tar-riffieda huma faċilment biex jiddaħħlu fit-tubu ta 'ġewwa u t-tubu ta' barra.
6. Il-pallets b'saħħithom jiżguraw it-trasport faċilment u mingħajr periklu. -
Important Instruction
Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.