Shoring prop-Heavy duty
Folasaga o oloa
O le u'amea u'amea o se vaega taua e lagolago ai le faiga o le HORIZON formwork, aemaise lava i totonu o le sima. Faatasi ai ma le maualuga o le faʻaogaina o mea, maualalo le mamafa ma le mautu, HORIZON slab formwork e galue saogalemu ma lelei i luga o le nofoaga faʻapea foi ma le taugofie. E le gata i lea, o le prop e vave ma faigofie mo le taulimaina i luga o le saite.
Fa'amatalaga |
Malosiaga (KN) |
Maualuluga (mm) |
ia (mm) |
mamafa (Kg) |
HZP30-300 |
30 |
1650-3000 |
75/60 |
20.9 |
HZP30-350 |
30 |
1970-3500 |
75/60 |
23.0 |
HZP30-400 |
30 |
2210-4000 |
75/60 |
25.0 |
HZP20-300 |
20 |
1650-3000 |
60/48 |
15.7 |
HZP20-350 |
20 |
1970-3500 |
60/48 |
16.6 |
HZP20-450 |
20 |
2460-4500 |
60/48 |
28.2 |
HZP20-500 |
20 |
2710-5000 |
60/48 |
30.5 |
Tulaga lelei
- 1. O paipa uʻamea maualuga e faʻamautinoa ai le maualuga o le utaina.
2. O loʻo avanoa faʻamaeʻaina eseese, e pei o: galvanization vevela, galvanization malulu, paʻu paʻu ma vali.
3. O le mamanu faʻapitoa e puipuia ai le tagata faʻapipiʻi mai le faʻaleagaina o ona lima i le va o totonu ma fafo.
4. O le totonugalemu, pine ma fetuutuunai nati ua mamanuina puipuia mai le le fa'amoemoeina fa'ate'a.
5. Faʻatasi ai ma le tele tutusa o le ipu ma le ipu faʻavae, o ulu faʻapipiʻi e faigofie ona faʻapipiʻi i totonu o le paipa i totonu ma fafo.
6. O pallets malosi e faʻamautinoa le faigofie ma le saogalemu o felauaiga. -
Important Instruction
Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.