Kukwira Formwork CB240
Tsanangudzo
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Zvakanakira
- Inoenderana neese Construccion wall formworks.
- Iwo maseti akaumbwa nemabhuraketi uye formwork mapaneru anofambiswa kune inotevera nhanho yekudira ine one one crane lift.
- Inochinjika kune chero zvimiro, zvinosanganisira dzakatwasuka, dzakarerekera uye dzakatenderedzwa madziro.
- Zvinokwanisika kuvaka mapuratifomu ekushanda pamatanho akasiyana-siyana.Kuwana kune platformsis inopiwa nekuchengetedza manera.
- Mabhuraketi ese anosanganisira ese majoini ekugadzirisa handrails, push-pullprops uye zvimwe zvishongedzo.
- Mabhuraketi ekukwira anobvumira kutenderedza-kumashure iyo formwork panelsusing system, yakaumbwa nengoro uye rack, inosanganisirwa mumabhuraketi aya.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Mabhureki akasungirirwa kumadziro ane anchor cone system.
Nzira yekukwira
The first pouring is to be completed by using the proper wall elements and has to be exactly yakabatana nekugadzirisa struts. |
Danho rechipiri The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Danho rechitatu After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Danho rechina Release and remove bolts that fixing the positioning anchor point. Sunungura uye bvisa tie-rod Loosen the wedges of the carriage unit. |
Danho rechishanu Retract the carriage and lock it with wedge. Isa macones ekukwira kumusoro Sunungura mhepo yekuchengetedza mudziyo, kana iripo Bvisa koni yekukwira yakaderera
|
Danho rechitanhatu Adjust the carriage into the common center of gravity and lock it again. Batanidza chipfuramabwe checrane kune yakatwasuka waling Bvisa mabhaudhi ekuchengetedza ebhureki Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Pinza uye kiya mabhaudhi ekuchengetedza zvakare. Isa mudziyo wekutakura mhepo, kana zvichidikanwa. |
Danho rechinomwe Move the carriage back and lock it by wedge. Chenesa fomu. Isa masimbi ekusimbisa. |
Nhanho yechisere Move the formwork forward until lower end rests against top of the finished section of the wall Gadzirisa formwork yakatwasuka uchishandisa push-dhonza brace. Gadzirisa tie-rods yemadziro formwork |