Shoring prop-Heavy duty

Inogadziriswa simbi prop ye slab formwork
Simbi prop chinhu chakakosha chinotsigira cheHORIZON formwork system, kunyanya mune slab formwork. Iine iyo prop yakakwirira yekurodha huwandu, huremu hwakaderera uye kugadzikana, HORIZON slab formwork inoshanda zvakachengeteka uye nemazvo pasaiti pamwe nemutengo-unoshanda. Zvakare, iyo prop inokurumidza uye iri nyore kubata pane saiti.

 



Product Detail

Product Sumo

 

Simbi prop chinhu chakakosha chinotsigira cheHORIZON formwork system, kunyanya mune slab formwork. Iine iyo prop yakakwirira yekurodha huwandu, huremu hwakaderera uye kugadzikana, HORIZON slab formwork inoshanda zvakachengeteka uye nemazvo pasaiti pamwe nekudhura-inoshanda. Zvakare, iyo prop inokurumidza uye iri nyore kubata pane saiti.

Tsanangudzo

Kugona (KN)

Urefu (mm)

Iye (mm)

Huremu (Kg)

HZP30-300

30

1650-3000

75/60

20.9

HZP30-350

30

1970-3500

75/60

23.0

HZP30-400

30

2210-4000

75/60

25.0

HZP20-300

20

1650-3000

60/48

15.7

HZP20-350

20

1970-3500

60/48

16.6

HZP20-450

20

2460-4500

60/48

28.2

HZP20-500

20

2710-5000

60/48

30.5

Zvakanakira

 

  1. 1. High quality simbi machubhu inova nechokwadi chekutakura kwayo.
    2. Kupedzwa kwakasiyana-siyana kunowanikwa, zvakadai se: galvanization inopisa-yakanyungudutswa, kutonhora kunotonhora, kuvhara kwehupfu uye kupenda.
    3. Kugadzirwa kwakakosha kunodzivirira mushandi kuti asakuvadza maoko ake pakati pechubhu yemukati nekunze.
    4. Ichubhu yemukati, pini uye nut inogadziriswa yakagadzirirwa kuchengetedzwa kubva pakusazvipira.
    5. Nekukura kwakafanana kweplate uye chigadziko cheplate, misoro yeprop iri nyore kuisa mukati mechubhu yemukati uye kunze kwechubhu.
    6. Mapallet akasimba anovimbisa kutakura nyore uye zvakachengeteka.
  2. Important Instruction

Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.

Kana iwe uchifarira zvigadzirwa zvedu, unogona kusarudza kusiya ruzivo rwako pano, uye isu tichabatana newe munguva pfupi.


Nyora meseji yako pano uye titumire kwatiri

Zvigadzirwa zvikamu

Kana iwe uchifarira zvigadzirwa zvedu, unogona kusarudza kusiya ruzivo rwako pano, uye isu tichabatana newe munguva pfupi.


snShona