Shoring prop-Heavy duty

prop baja adjustable pikeun slab formwork
Baja prop mangrupa komponén ngarojong penting tina sistem formwork HORIZON, utamana dina formwork slab. Kalayan kapasitas ngamuat anu luhur, beurat rendah sareng stabilitas, HORIZON slab formwork tiasa dianggo aman sareng éfisién dina situs ogé murah. Ogé, prop téh gancang sarta gampang pikeun nanganan dina situs.

 



Rincian produk

Bubuka produk

 

Baja prop mangrupa komponén ngarojong penting tina sistem formwork HORIZON, utamana dina formwork slab. Kalawan kapasitas loading prop urang tinggi, beurat low jeung stabilitas, HORIZON slab formwork jalan aman tur éfisién dina situs ogé ongkos-éféktif. Ogé, prop téh gancang sarta gampang pikeun nanganan dina situs.

Spésifikasi

Kapasitas (KN)

Jangkungna (mm)

Anjeunna (mm)

Beurat (Kg)

HZP30-300

30

1650-3000

75/60

20.9

HZP30-350

30

1970-3500

75/60

23.0

HZP30-400

30

2210-4000

75/60

25.0

HZP20-300

20

1650-3000

60/48

15.7

HZP20-350

20

1970-3500

60/48

16.6

HZP20-450

20

2460-4500

60/48

28.2

HZP20-500

20

2710-5000

60/48

30.5

Kaunggulan

 

  1. 1. tabung baja kualitas luhur ensures kapasitas loading tinggi na.
    2. Rupa-rupa pagawean sadia, kayaning: galvanization panas-dipped, galvanization tiis, bubuk palapis jeung lukisan.
    3. Desain husus nyegah operator ti hurting leungeun-Na antara tube jero jeung luar.
    4. The tube jero, pin na nut adjustable dirancang ditangtayungan ngalawan disengagement dihaja.
    5. Jeung ukuran sarua tina piring jeung pelat basa, huluna prop gampang nyelapkeun dina tube jero tur tube luar.
    6. The pallets kuat mastikeun transportasi gampang tur aman.
  2. Important Instruction

Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.

Mun anjeun kabetot dina produk urang, Anjeun bisa milih ninggalkeun informasi anjeun didieu, sarta kami bakal di kabaran ku anjeun teu lila.


Tulis pesen anjeun di dieu sareng kirimkeun ka kami

Kategori produk

Mun anjeun kabetot dina produk urang, Anjeun bisa milih ninggalkeun informasi anjeun didieu, sarta kami bakal di kabaran ku anjeun teu lila.


suSundanese