I-Climbing Formwork CB240
Izincazelo
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Izinzuzo
- Ihambisana nawo wonke amafomu odonga lwe-Construccion.
- Amasethi akhiwe ngabakaki namaphaneli e-formwork ayiswa esinyathelweni esilandelayo sokuthela ngokuphakanyiswa kwe-one single crane.
- Ivumelana nanoma yiziphi izakhiwo, okuhlanganisa izindonga eziqondile, ezithambekele neziyisiyingi.
- Kungenzeka ukwakha amapulatifomu okusebenza emazingeni ahlukene.Ukufinyelela ku-platformsis okuhlinzekwa ngamaladi okuphepha.
- Bonke abakaki bahlanganisa zonke izixhumi zokulungisa ama-handrails, ama-push-pullprops nezinye izesekeli.
- Abakaki abakhuphukayo bavumela ukubuyisela emuva i-formwork panelsusing system, eyakhiwe inqola kanye nerack, ehlanganiswe kulaba bakakaki.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Abakaki banamathiselwe odongeni ngesistimu yekhoni lehange.
Inqubo yokukhuphuka
The first pouring is to be completed by using the proper wall elements and has to be exactly kuqondaniswe nama-struts okulungisa. |
Isinyathelo sesi-2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Isinyathelo sesi-3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Isinyathelo sesi-4 Release and remove bolts that fixing the positioning anchor point. Khulula futhi ususe i-tie-rod Loosen the wedges of the carriage unit. |
Isinyathelo sesi-5 Retract the carriage and lock it with wedge. Faka izigaxa ezikhuphukela phezulu Khulula idivayisi yokuvikela umoya, uma ikhona Susa ikhoni yokugibela ephansi
|
Isinyathelo sesi-6 Adjust the carriage into the common center of gravity and lock it again. Namathisela isilingi se-crane ku-waling eqondile Susa amabhawudi okuvikela abakaki Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Faka futhi ukhiye amabhawodi okuvikela futhi. Faka idivayisi yokulayisha umoya, uma kudingeka. |
Isinyathelo sesi-7 Move the carriage back and lock it by wedge. Hlanza ifomu. Faka imigoqo yokuqinisa. |
Isinyathelo sesi-8 Move the formwork forward until lower end rests against top of the finished section of the wall Lungisa i-formwork iqonde phezulu usebenzisa i-push-pull brace. Lungisa ama-tie-rods okwakhiwa kodonga |