Shoring prop-Heavy duty
Isingeniso Somkhiqizo
Ipropu yensimbi iyingxenye ebalulekile esekelayo yesistimu ye-HORIZON formwork, ikakhulukazi ku-slab formwork. Ngomthamo omkhulu wokulayisha we-prop, isisindo esiphansi nokuzinza, i-HORIZON slab formwork isebenza ngokuphepha nangempumelelo esizeni futhi iyonga. Futhi, i-prop iyashesha futhi kulula ukuyiphatha esizeni.
Ukucaciswa |
Amandla (KN) |
Ubude (mm) |
Yena (mm) |
Isisindo (Kg) |
I-HZP30-300 |
30 |
1650-3000 |
75/60 |
20.9 |
I-HZP30-350 |
30 |
1970-3500 |
75/60 |
23.0 |
I-HZP30-400 |
30 |
2210-4000 |
75/60 |
25.0 |
I-HZP20-300 |
20 |
1650-3000 |
60/48 |
15.7 |
I-HZP20-350 |
20 |
1970-3500 |
60/48 |
16.6 |
I-HZP20-450 |
20 |
2460-4500 |
60/48 |
28.2 |
I-HZP20-500 |
20 |
2710-5000 |
60/48 |
30.5 |
Izinzuzo
- 1. Amashubhu ensimbi ekhwalithi ephezulu aqinisekisa umthamo wawo wokulayisha ophezulu.
2. Ukuqedela okuhlukahlukene kuyatholakala, okufana nalokhu: i-galvanization ecwilisiwe eshisayo, i-galvanization ebandayo, i-powder coating kanye nokudweba.
3. Umklamo okhethekile uvimbela opharetha ukuba angalimazi izandla zakhe phakathi kweshubhu yangaphakathi nangaphandle.
4. Ishubhu yangaphakathi, iphinikhodi kanye namantongomane alungisekayo aklanyelwe ukuvikelwa ekukhishweni okungahlosiwe.
5. Ngosayizi ofanayo wepuleti ne-base plate, amakhanda e-prop afakwa kalula eshubhuni elingaphakathi nangaphandle.
6. Ama-pallets aqinile aqinisekisa ukuthutha kalula futhi ngokuphepha. -
Important Instruction
Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.