Ụdị ọrụ ịrị elu CB240
Nkọwa
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Uru
- Dakọtara na ụdị ọrụ mgbidi Construccion niile.
- A na-akwagharị ihe ndị nwere brackets na panetị na-arụ ọrụ n'ọkwa na-esote ngwunye kreenu onye otu.
- Na-adaba n'ụdị ọ bụla, gụnyere mgbidi kwụ ọtọ, nke nwere mmasị na mgbidi okirikiri.
- Ọ ga-ekwe omume ịmepụta ikpo okwu na-arụ ọrụ na ọkwa dị iche iche. Ịnweta ikpo okwu na-enye site na ladders nchekwa.
- Ihe nkwado niile gụnyere njikọ niile iji dozie okporo ụzọ aka, push-pullprops na ngwa ndị ọzọ.
- Ihe nkwado ịrị elu ahụ na-enye ohere ịghaghachi azụ n'ụdị panel nke na-eme ka sistemu, nke ụgbọ na-ebu na akwa kpụrụ, etinyere n'ime brackets ndị a.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Ejiri usoro arịlịka cone gbagidere na mgbidi.
Usoro ịrị elu
The first pouring is to be completed by using the proper wall elements and has to be exactly kwekọọ na nhazi struts. |
Nzọụkwụ 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Nzọụkwụ 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Nzọụkwụ 4 Release and remove bolts that fixing the positioning anchor point. Tọpụ ma wepụ eriri eriri Loosen the wedges of the carriage unit. |
Nzọụkwụ 5 Retract the carriage and lock it with wedge. Wụnye cones ịrị elu Tọpụ ngwaọrụ nchekwa ikuku, ọ bụrụ na ọ dị Wepu cone ịrị elu ala
|
Nzọụkwụ 6 Adjust the carriage into the common center of gravity and lock it again. Gbakwunye èbè kreenụ ahụ na waling kwụ ọtọ Wepu bolts nchekwa nke nkwado Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Fanye ma kpochie bolts nchekwa ọzọ. Wụnye ngwaọrụ na-ebu ifufe, ọ bụrụ na achọrọ ya. |
Nzọụkwụ 7 Move the carriage back and lock it by wedge. Hichaa usoro nhazi. Wụnye ogwe nkwado. |
Nzọụkwụ 8 Move the formwork forward until lower end rests against top of the finished section of the wall Gbanwee ọrụ n'ụzọ kwụ ọtọ site na nkwado ndọtị. Idozi eriri eriri maka mgbidi mgbidi |