Shoring prop-Heavy duty

Ngwongwo nchara na-agbanwe agbanwe maka ụdị slab
Ngwongwo ígwè bụ ihe dị mkpa na-akwado usoro HORIZON, karịsịa na slab formwork. Site n'iji ikike ibu ihe dị elu, ịdị arọ na nkwụsi ike, HORIZON slab formwork na-arụ ọrụ n'enweghị nsogbu na nke ọma na saịtị yana ọnụ ahịa bara uru. Ọzọkwa, prop na-adị ngwa ma dị mfe maka njikwa na saịtị.

 



Nkọwa ngwaahịa

Okwu Mmalite ngwaahịa

 

Ngwongwo ígwè bụ ihe dị mkpa na-akwado usoro HORIZON, karịsịa na slab formwork. Site n'iji ikike ibu ihe dị elu, ịdị arọ na nkwụsi ike, HORIZON slab formwork na-arụ ọrụ n'enweghị nsogbu na nke ọma na saịtị yana ọnụ ahịa bara uru. Ọzọkwa, prop na-adị ngwa ma dị mfe maka njikwa na saịtị.

Nkọwapụta

Ike (KN)

Ogologo (mm)

Ọ (mm)

Arọ (Kg)

HZP30-300

30

1650-3000

75/60

20.9

HZP30-350

30

1970-3500

75/60

23.0

HZP30-400

30

2210-4000

75/60

25.0

HZP20-300

20

1650-3000

60/48

15.7

HZP20-350

20

1970-3500

60/48

16.6

HZP20-450

20

2460-4500

60/48

28.2

HZP20-500

20

2710-5000

60/48

30.5

Uru

 

  1. 1. Igwe nchara ígwè dị elu na-eme ka ikike ya dị elu.
    2. A na-emecha ihe dị iche iche, dị ka: galvanization na-ekpo ọkụ, galvanization oyi, mkpuchi ntụ ntụ na eserese.
    3. Nhazi pụrụ iche na-egbochi onye na-arụ ọrụ imerụ aka ya n'etiti tube n'ime na n'èzí.
    4. A na-emepụta tube dị n'ime, pin na aku a na-agbanwe agbanwe na-echebe ya pụọ ​​​​na njedebe na-amaghị ama.
    5. N'otu nha nke efere na efere isi, ndị isi prop na-adị mfe itinye n'ime tube dị n'ime na n'èzí.
    6. Pallets siri ike na-eme ka njem ahụ dị mfe na n'enweghị nsogbu.
  2. Important Instruction

Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.

Ọ bụrụ na ị nwere mmasị na ngwaahịa anyị, ị nwere ike ịhọrọ ịhapụ ozi gị ebe a, anyị ga-akpọtụrụ gị n'oge na-adịghị anya.


Dee ozi gị ebe a ziga anyị ya

Ụdị ngwaahịa

Ọ bụrụ na ị nwere mmasị na ngwaahịa anyị, ị nwere ike ịhọrọ ịhapụ ozi gị ebe a, anyị ga-akpọtụrụ gị n'oge na-adịghị anya.


igIgbo