Shoring prop-Heavy duty
Panimula ng Produkto
Ang steel prop ay isang mahalagang sumusuportang bahagi ng HORIZON formwork system, lalo na sa slab formwork. Sa mataas na kapasidad ng paglo-load ng prop, mababang timbang at katatagan, gumagana nang ligtas at mahusay ang HORIZON slab formwork sa site pati na rin ang cost-effective. Gayundin, ang prop ay mabilis at madali para sa paghawak sa site.
Pagtutukoy |
Kapasidad (KN) |
Taas (mm) |
Siya (mm) |
Timbang (kg) |
HZP30-300 |
30 |
1650-3000 |
75/60 |
20.9 |
HZP30-350 |
30 |
1970-3500 |
75/60 |
23.0 |
HZP30-400 |
30 |
2210-4000 |
75/60 |
25.0 |
HZP20-300 |
20 |
1650-3000 |
60/48 |
15.7 |
HZP20-350 |
20 |
1970-3500 |
60/48 |
16.6 |
HZP20-450 |
20 |
2460-4500 |
60/48 |
28.2 |
HZP20-500 |
20 |
2710-5000 |
60/48 |
30.5 |
Mga kalamangan
- 1. Tinitiyak ng mataas na kalidad na mga tubo ng bakal ang mataas na kapasidad ng paglo-load nito.
2. Available ang iba't ibang finishing, tulad ng: hot-dipped galvanization, cold galvanization, powder coating at painting.
3. Pinipigilan ng espesyal na disenyo ang operator na masaktan ang kanyang mga kamay sa pagitan ng panloob at panlabas na tubo.
4. Ang inner tube, pin at adjustable nut ay dinisenyo na protektado laban sa hindi sinasadyang pagkakatanggal.
5. Sa parehong sukat ng plato at base plate, ang mga ulo ng prop ay madaling ipasok sa panloob na tubo at panlabas na tubo.
6. Tinitiyak ng malalakas na pallets ang transportasyon nang madali at ligtas. -
Important Instruction
Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.