Shoring prop-Heavy duty
Intshayelelo yeMveliso
Ipropu yentsimbi yinxalenye ebalulekileyo yenkxaso yenkqubo ye-HORIZON, ngakumbi kwi-slab formwork. Ngomthamo ophezulu wokulayisha wepropu, ubunzima obuphantsi kunye nokuzinza, i-HORIZON slab formwork isebenza ngokukhuselekileyo nangokufanelekileyo kwisiza kunye neendleko eziphantsi. Kwakhona, ipropu iyakhawuleza kwaye kulula ukuyiphatha kwindawo.
Inkcazo |
Umthamo (KN) |
Ubude (mm) |
Yena (mm) |
Ubunzima (Kg) |
HZP30-300 |
30 |
1650-3000 |
75/60 |
20.9 |
HZP30-350 |
30 |
1970-3500 |
75/60 |
23.0 |
HZP30-400 |
30 |
2210-4000 |
75/60 |
25.0 |
HZP20-300 |
20 |
1650-3000 |
60/48 |
15.7 |
HZP20-350 |
20 |
1970-3500 |
60/48 |
16.6 |
HZP20-450 |
20 |
2460-4500 |
60/48 |
28.2 |
HZP20-500 |
20 |
2710-5000 |
60/48 |
30.5 |
Iingenelo
- 1. Iityhubhu zetsimbi ezisemgangathweni ziqinisekisa umthamo wayo ophezulu wokulayisha.
2. Ukugqitywa kweendidi ezahlukeneyo zikhoyo, ezifana: i-galvanization edibeneyo eshushu, i-galvanization ebandayo, i-powder coating kunye nepeyinti.
3. Uyilo olukhethekileyo luthintela umqhubi ukuba angalimaza izandla zakhe phakathi kombhobho wangaphakathi nangaphandle.
4. I-tube yangaphakathi, ipini kunye ne-nut ehlengahlengiswayo yenzelwe ukukhuselwa ngokungazinzi.
5. Ngobukhulu obufanayo beplate kunye nesiseko seplate, iintloko zeprop kulula ukuzifaka kwi-tube yangaphakathi kunye ne-tube yangaphandle.
6. Iipalati ezinamandla ziqinisekisa ukuthutha ngokulula nangokukhuselekileyo. -
Important Instruction
Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.