Shoring prop-Heavy duty

Adjustable steel prop for slab formwork
Steel prop is an important supporting component of HORIZON formwork system, especially in the slab formwork. With the prop’s high loading capacity, low weight and stability, HORIZON slab formwork works safely and efficiently on site as well as cost-effective. Also, the prop is fast and easy for handling on site.

 



Product Detail

Product Introduction

 

Steel prop is an important supporting component of HORIZON formwork system, especially in the slab formwork. With the prop’s high loading capacity, low weight and stability, HORIZON slab formwork works safely and efficiently on site as well as cost-effective. Also, the prop is fast and easy for handling on site.

Specification

Capacity (KN)

Height (mm)

Dia (mm)

Weight (Kg)

HZP30-300

30

1650-3000

75/60

20.9

HZP30-350

30

1970-3500

75/60

23.0

HZP30-400

30

2210-4000

75/60

25.0

HZP20-300

20

1650-3000

60/48

15.7

HZP20-350

20

1970-3500

60/48

16.6

HZP20-450

20

2460-4500

60/48

28.2

HZP20-500

20

2710-5000

60/48

30.5

Advantages

 

  1. 1. High quality steel tubes ensures its high loading capacity.
    2. Various finishing are available, such as: hot-dipped galvanization, cold galvanization, powder coating and painting.
    3. Special design prevents the operator from hurting his hands between the inner and outer tube.
    4. The inner tube, pin and adjustable nut are designed protected against unintentional disengagement.
    5. With the same size of the plate and base plate, the prop heads are easily to insert in the inner tube and outer tube.
    6. The strong pallets ensure the transportation easily and safely.
  2. Important Instruction

Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


Write your message here and send it to us

Products categories

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


en_USEnglish