Shoring prop-Heavy duty
Hordhac Product
Qalabka birta ah waa qayb muhiim ah oo kaalmaysa nidaamka qaab-shaqeedka HORIZON, gaar ahaan qaabka qaab-dhismeedka. Iyada oo leh awoodda wax-qaadista sare ee qalabka, miisaanka hooseeya iyo xasilloonida, HORIZON qaab-shaqeedka saqafka wuxuu u shaqeeyaa si badbaado leh oo hufan goobta iyo sidoo kale kharash-ool ah. Sidoo kale, qalabku waa mid degdeg ah oo sahlan in lagu maareeyo goobta.
Tilmaamid |
Awoodda (KN) |
Dhererka (mm) |
Isaga (mm) |
Miisaanka (Kg) |
HZP30-300 |
30 |
1650-3000 |
75/60 |
20.9 |
HZP30-350 |
30 |
1970-3500 |
75/60 |
23.0 |
HZP30-400 |
30 |
2210-4000 |
75/60 |
25.0 |
HZP20-300 |
20 |
1650-3000 |
60/48 |
15.7 |
HZP20-350 |
20 |
1970-3500 |
60/48 |
16.6 |
HZP20-450 |
20 |
2460-4500 |
60/48 |
28.2 |
HZP20-500 |
20 |
2710-5000 |
60/48 |
30.5 |
Faa'iidooyinka
- 1. Tuubooyinka birta ah ee tayada sare leh waxay hubinayaan awoodeeda sare ee culeyska.
2. Dhamaystir kala duwan ayaa la heli karaa, sida: galvanization kulul, galvanization qabow, daahan budada ah iyo rinjiyeynta.
3. Naqshadaynta gaarka ah waxay ka hortagtaa hawlwadeenku inuu waxyeeleeyo gacmihiisa inta u dhaxaysa tuubada gudaha iyo dibadda.
4. Tuubada gudaha, biin iyo lowska la hagaajin karo waxaa loo qaabeeyey inay ka ilaalinayaan kala tag aan ula kac ahayn.
5. Iyada oo la mid ah cabbirka saxanka iyo saxanka salka, madaxyada dabaysha ayaa si fudud u gelinaya tuubada gudaha iyo tuubada dibadda.
6. Sariiraha xoogga leh waxay xaqiijiyaan gaadiidka si sahlan oo badbaado leh. -
Important Instruction
Important Instructions:
• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.