HORIZON wall formwork consists of H20 timber beam, steel walings and other connecting parts. These components can be assembled formwork panels in different widths and heights, depending on the H20 beam length up to 6.0m.
The H20 beam is the basic component of all the elements, with nominal lengths of 0.9 m up to 6.0 m. It has an extremely high load-bearing capacity with a weight of only 4.80 kg/m, which results in fewer walings and tie positions. H20 timber beam can be applied to all wall heights and elements are assembled together appropriately according to each specific project.
Hana ʻia nā waling kila e like me nā lōʻihi i hoʻonohonoho pono ʻia. ʻO nā puka lōʻihi i loko o nā mea hoʻohui kila a me nā mea hoʻohui waling ka hopena i nā pilina paʻa mau ʻano (ka hoʻopaʻa ʻana a me ke kaomi). Hoʻopili paʻa ʻia kēlā me kēia hui waling e kahi mea hoʻohui waling a me nā pine wedge ʻehā.
Panel struts (also called “Push-pull prop) are mounted on the steel waling, helping formwork panels erection. The length of panel struts are selected according to the height of the formwork panels.
Using the top scaffold bracket, working and concreting platforms are mounted to the wall formwork.
This consists of: top scaffold bracket, planks, steel pipes and pipe couplers.
Nā mea hana pā
Nā ʻāpana |
Diagram / kiʻi |
Hōʻike / wehewehe |
ʻO ka papa hana pā |
|
No nā ʻano hana kuʻekuʻe a pau |
H20 Kaola laau |
|
Ua mālama ʻia ka wai Kiʻekiʻe: 200mm Laulā: 80mm Ka lōʻihi: e like me ka nui o ka pākaukau |
Waling kila |
|
Pena ʻia, uhi ʻia ka pauda [12 ala kila
|
Paʻi paʻi |
|
Galvanized No ka hoʻohui ʻana i nā kaola kila a me nā kaola H20 |
Ke kuʻekuʻe panel (Push-pull prop) |
|
Pena No ke kōkua ʻana i ke kūkulu ʻana o ka panel formwork |
Huina Waling 80 |
|
Pena Hoʻohana ʻia no ka alignment panel formwork |
Huina kihi 60x60 |
|
Pena Hoʻohana ʻia no ka hana ʻana i ka formwork kihi o loko me nā pine wedge |