Klatreforskalling CB240
Beskrivelser
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Fordele
- Kompatibel med alle Construccion vægforskallinger.
- Sættene, der består af beslag og forskallingspaneler, flyttes til næste støbetrin med en enkelt kranløft.
- Kan tilpasses alle strukturer, inklusive lige, skrå og cirkulære vægge.
- Det er muligt at bygge arbejdsplatforme på forskellige niveauer. Adgangen til platformen leveres af sikkerhedsstiger.
- Alle beslag inkluderer alle stik til fastgørelse af gelændere, push-pullprops og andet tilbehør.
- Klatrebeslagene gør det muligt at rulle forskallingspanelerne tilbage ved hjælp af et system, dannet af en vogn og et stativ, der er indbygget i disse beslag.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Beslag forankres til væggen med ankerkeglesystem.
Klatreprocedure
The first pouring is to be completed by using the proper wall elements and has to be exactly justeret med justeringsstivere. |
Trin 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Trin 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Trin 4 Release and remove bolts that fixing the positioning anchor point. Løsn og fjern trækstangen Loosen the wedges of the carriage unit. |
Trin 5 Retract the carriage and lock it with wedge. Installer øvre klatrekegler Løsn evt. vindsikring Fjern den nederste klatrekegle
|
Trin 6 Adjust the carriage into the common center of gravity and lock it again. Fastgør kranslyngen til den lodrette væg Fjern sikkerhedsboltene på beslaget Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Indsæt og lås sikkerhedsboltene igen. Installer om nødvendigt vindbelastningsanordningen. |
Trin 7 Move the carriage back and lock it by wedge. Rengør forskallingen. Monter forstærkningsstænger. |
Trin 8 Move the formwork forward until lower end rests against top of the finished section of the wall Juster forskallingen lodret ved hjælp af push-pull afstivning. Fastgør trækstænger til vægforskallingen |