Gigun Fọọmù CB240

Gigun Fọọmu CB240 jẹ eto gigun ti Kireni ti o gbẹkẹle ati eto atilẹyin ti a lo pupọ lati tú awọn odi giga. O ṣe bi iru ẹrọ ikojọpọ bi iru ẹrọ iṣẹ ṣiṣe ailewu.

Ti o da lori gigun ti pẹpẹ, Eto Gigun jẹ iwulo si awọn giga ti o ju awọn mita 100 lọ lori ilẹ ati gba aaye giga fọọmu ti o pọju to 5.40 m.



Alaye ọja

Awọn apejuwe

Platform width:      2.4m
Roll-back system:   70 cm with carriage and rack system
Finishing platform:  for removing the climbing cone, polishing concrete surface etc.
Anchor system:      should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork:            can be moved horizontally, vertically and tilted to meet site requirement.
Main platform:       provide workers a safe working platform
Finishing platform:  there is an access to the main platform by using a safety ladder.

  • Read More About china semi automatic climbing formwork

     

  • Read More About climbing formwork for core wall

     

  • Read More About china climbing formwork system

     

  • Read More About china climbing system formwork

     

Awọn anfani

  • Ni ibamu pẹlu gbogbo awọn iṣẹ ọna odi Construccion.
  • Awọn eto ti a ṣe pẹlu awọn biraketi ati awọn panẹli iṣẹ fọọmu ni a gbe si igbesẹ ti nbọ atẹle pẹlu gbigbe Kireni onesingle.
  • Ibadọgba si eyikeyi awọn ẹya, pẹlu taara, ti idagẹrẹ ati awọn odi ipin.
  • O ṣee ṣe lati kọ awọn iru ẹrọ ṣiṣẹ ni awọn ipele oriṣiriṣi.Wiwọle si pẹpẹ ti a pese nipasẹ awọn ipele ailewu.
  • Gbogbo awọn biraketi pẹlu gbogbo awọn asopọ lati ṣatunṣe awọn ọna ọwọ, titari-pullprops ati awọn ẹya ẹrọ miiran.
  • Awọn biraketi gigun n gba sẹsẹ-pada awọn ọna kika paneli ti n ṣe agbekalẹ eto kan, ti a ṣẹda nipasẹ gbigbe ati agbeko kan, ti o dapọ ninu awọn biraketi wọnyi.
  • Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
  • Biraketi duro si ogiri pẹlu eto konu oran.

Ilana gigun

Read More About climbing formworkIgbesẹ 1

The first pouring is to be completed by using the proper wall elements and has to be exactly

ni ibamu pẹlu awọn struts ti n ṣatunṣe.

Read More About climbing formworks

Igbesẹ 2

The completely pre-assembled climbing scaffold units consisting of

climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured.

Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed.

Read More About climbing formwork system

Igbesẹ 3

After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system.

Read More About climbing system formwork

Igbesẹ 4

Release and remove bolts that fixing the positioning anchor point.

Tu ati yọ tai-ọpa kuro

Loosen the wedges of the carriage unit.

Read More About self climbing formwork system

Igbesẹ 5

Retract the carriage and lock it with wedge.

Fi sori ẹrọ awọn cones gígun oke

Tu ẹrọ aabo afẹfẹ silẹ, ti o ba jẹ eyikeyi

Yọ konu gígun isalẹ

 

Read More About automatic climbing formwork system

Igbesẹ 6

Adjust the carriage into the common center of gravity and lock it again.

So awọn Kireni sling si inaro waling

Yọ awọn boluti aabo ti akọmọ

Lift the climbing bracket by crane and attach it to the next prepared climbing cone.

Fi sii ki o si tii awọn boluti aabo lẹẹkansi.

Fi sori ẹrọ ẹrọ fifuye afẹfẹ, ti o ba nilo.

Read More About auto climbing formwork system

Igbesẹ 7

Move the carriage back and lock it by wedge.

Nu fọọmu fọọmu.

Fi sori ẹrọ awọn ọpa imuduro.

Read More About climbing formworks

Igbesẹ 8

Move the formwork forward until lower  end rests against top of the finished section of the wall

Ṣatunṣe iṣẹ fọọmu ni inaro nipasẹ ọna titari-fa àmúró.

Fix tai-opa fun ogiri formwork

 

 

Ti o ba nifẹ si awọn ọja wa, o le yan lati fi alaye rẹ silẹ nibi, ati pe a yoo kan si ọ laipẹ.


Kọ ifiranṣẹ rẹ nibi ki o si fi si wa

Awọn ẹka ọja

Ti o ba nifẹ si awọn ọja wa, o le yan lati fi alaye rẹ silẹ nibi, ati pe a yoo kan si ọ laipẹ.


yoYoruba