Climbing Formwork CB240
Famaritana
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
tombony
- Mifanaraka amin'ny fanamboarana rindrina Construccion rehetra.
- Afindra amin'ny dingana fandatsahana manaraka miaraka amin'ny fampiakarana vano tokana ireo andiany voaforona amin'ny fonon-tanana sy tontonana.
- Mety amin'ny rafitra rehetra, anisan'izany ny rindrina mahitsy, mitongilana ary boribory.
- Azo atao ny manangana sehatra miasa amin'ny ambaratonga samihafa.Ny fidirana amin'ny platformsis omen'ny tohatra fiarovana.
- Ny brackets rehetra dia ahitana ny connecteurs rehetra hanamboarana ny tanana, push-pullprops ary kojakoja hafa.
- Ny brackets amin'ny fiakarana dia mamela ny famerenana indray ny takelaka formwork amin'ny alàlan'ny rafitra iray, noforonin'ny kalesy sy rack, tafiditra ao anatin'ireto bracket ireto.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Ny bracket dia mifatotra amin'ny rindrina miaraka amin'ny rafitra cone anchor.
Fomba fiakarana
The first pouring is to be completed by using the proper wall elements and has to be exactly mifanaraka amin'ny fanitsiana struts. |
Dingana 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Dingana 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Dingana 4 Release and remove bolts that fixing the positioning anchor point. Esory ary esory ny fatorana Loosen the wedges of the carriage unit. |
Dingana 5 Retract the carriage and lock it with wedge. Mametraka cones ambony fiakarana Esory ny fitaovana fiarovana ny rivotra, raha misy Esory ny cone ambany miakatra
|
Dingana 6 Adjust the carriage into the common center of gravity and lock it again. Ampifandraiso amin'ny antsamotady mitsangana ny antsamotady Esory ny bolts fiarovana amin'ny bracket Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Ampidiro sy hidio indray ny bolts fiarovana. Apetraho ny fitaovana enti-mitondra rivotra, raha ilaina. |
Dingana 7 Move the carriage back and lock it by wedge. Diovy ny lasitra. Mametraka bara fanamafisana. |
Dingana 8 Move the formwork forward until lower end rests against top of the finished section of the wall Ampifanaraho mitsangana amin'ny alàlan'ny fanerena misintona. Amboary ny fatorana ho an'ny rindrina |