Beskriuwings
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Foardielen
- Kompatibel mei alle Construccion muorre bekistingen.
- De sets besteande út beugels en bekistingspanelen wurde ferpleatst nei de folgjende stap stap mei ien kraanlift.
- Oanpasber oan alle struktueren, ynklusyf rjochte, hellende en rûne muorren.
- It is mooglik om wurkplatfoarms op ferskate nivo's te bouwen. De tagong ta it platfoarm wurdt levere troch feiligensljedders.
- Alle beugels omfetsje alle ferbiningen om leuningen, push-pullprops en oare aksessoires te fixearjen.
- De klimbeugels kinne it bekistingspaniel weromrôlje mei in systeem, foarme troch in koets en in rek, opboud yn dizze beugels.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Brackets wurde ferankere oan 'e muorre mei ankerkegelsysteem.
Klimproseduere
The first pouring is to be completed by using the proper wall elements and has to be exactly ôfstimd mei it oanpassen fan struts. |
Stap 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Stap 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Stap 4 Release and remove bolts that fixing the positioning anchor point. Losmeitsje en fuortsmite tie-rod Loosen the wedges of the carriage unit. |
Stap 5 Retract the carriage and lock it with wedge. Ynstallearje boppeste climbing cones Losmeitsje wyn befeiliging apparaat, as ien Ferwiderje de legere klimkegel
|
Stap 6 Adjust the carriage into the common center of gravity and lock it again. Befestigje de kraan sling oan de fertikale waling Ferwiderje de feiligensbouten fan 'e beugel Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Ynfoegje en beskoattelje de feiligens bouten wer. Ynstallearje de wyn-load apparaat, as nedich. |
Stap 7 Move the carriage back and lock it by wedge. Reinigje de bekisting. Ynstallearje fersterking bars. |
Stap 8 Move the formwork forward until lower end rests against top of the finished section of the wall Bekisting fertikaal oanpasse troch middel fan push-pull brace. Fix tie-rods foar de muorre bekisting |