Formwork Dreapadóireachta CB240
Cur síos
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
Buntáistí
- Ag luí leis na foirmeacha balla Tógála go léir.
- Aistrítear na tacair atá comhdhéanta de lúibíní agus de phainéil fhoirm-oibre go dtí an chéad chéim dhoirteadh eile le hardaitheoir craein amháin.
- Inoiriúnaithe d'aon struchtúir, lena n-áirítear ballaí díreacha, claonta agus ciorclach.
- Is féidir ardáin oibre a thógáil ag leibhéil éagsúla. An rochtain ar an ardán a sholáthraíonn dréimirí sábháilteachta.
- Áirítear ar gach lúibíní na cónaisc go léir chun ráillí láimhe, brúigh-tarraingt agus gabhálais eile a shocrú.
- Ligeann na lúibíní dreapadóireachta an fhoirm-obair a rolladh siar agus úsáid á baint as córas, atá déanta ag carráiste agus raca, atá ionchorpraithe sna lúibíní seo.
- Formwork’s vertical adjusting and plumbing is completedwithleveling screw jacks and push-pull props.
- Tá lúibíní ar ancaire leis an mballa le córas cón ancaire.
Nós imeachta dreapadóireachta
The first pouring is to be completed by using the proper wall elements and has to be exactly ailínithe le teanntóga coigeartaithe. |
Céim 2 The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured. Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed. |
Céim 3 After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system. |
Céim 4 Release and remove bolts that fixing the positioning anchor point. Scaoil agus bain an tslat cheangail Loosen the wedges of the carriage unit. |
Céim 5 Retract the carriage and lock it with wedge. Suiteáil cóin dreapadóireachta uachtair Gléas daingnithe gaoithe scaoilte, más ann dó Bain an cón dreapadóireachta níos ísle
|
Céim 6 Adjust the carriage into the common center of gravity and lock it again. Ceangail sling na craein leis an mballa ingearach Bain na boltaí slándála den lúibín Lift the climbing bracket by crane and attach it to the next prepared climbing cone. Cuir isteach agus glas na boltaí slándála arís. Suiteáil an gléas gaoithe-ualach, más gá. |
Céim 7 Move the carriage back and lock it by wedge. Glan an formwork. Suiteáil barraí athneartaithe. |
Céim 8 Move the formwork forward until lower end rests against top of the finished section of the wall Coigeartaigh foirm-obair go hingearach le brace brú-tharraingt. Deisigh slata ceangail don formwork balla |